Scheduled inspection, testing and documentation for panels, switchgear, lighting and emergency systems, built to the NFPA 70B electrical maintenance standard and delivered by a named account contact.

Most commercial electrical failures announce themselves months in advance as a warm breaker, a loose lug or a battery that no longer holds a charge. A maintenance plan is how a building finds those before they become an outage. No Shorts Electric runs maintenance plans for offices, medical buildings, multifamily properties, retail and light industrial buildings across Nassau and western Suffolk.

Plans are built around quarterly, semi-annual or annual visits depending on the size of the building and the condition of its equipment, which is the approach NFPA 70B takes. Repairs found during a visit are quoted separately, so the plan fee stays predictable and you decide what gets fixed and when.

What a plan visit includes

  • Visual and mechanical inspection of panels, disconnects, switchgear and transfer equipment, with torque checks and cleaning where the manufacturer specifies.
  • Infrared thermal imaging of distribution equipment under load, annually or as the plan sets out.
  • Emergency and exit lighting functional tests, with the monthly and annual records the fire code requires.
  • Exterior and common-area lighting survey, photocell and timer checks.
  • Generator exercise and transfer switch check where the building has standby power.
  • A written report after every visit: findings, photos, repair recommendations in priority order, and an updated panel schedule.

What is excluded

Repairs, replacement parts and any work beyond inspection and testing are quoted and approved separately. Equipment owned by the utility, fire alarm systems and HVAC controls are outside the plan unless agreed in writing.

How plans are priced

The fee is set per building from the equipment count and the visit frequency, and held for the term of the agreement. Multi-building portfolios are priced as one account. We do not publish prices online; request a walkthrough and we will put a number on the scope you actually have.

Reference: NFPA 70B, Standard for Electrical Equipment Maintenance (2023 edition)

Questions managers ask

Is a maintenance program required?

NFPA 70B became a standard in 2023 and expects a documented electrical maintenance program. Whether it is enforced depends on your jurisdiction and insurer, but many insurers now ask for it.

How often should equipment be inspected?

NFPA 70B ties the interval to equipment condition and criticality, from annually for equipment in good condition to more often for equipment that is older or in a harsh environment. We set the interval with you after a first inspection.

Do you fix what you find?

Yes, as separate quoted work. Urgent safety items are flagged the same day.